The framing is finished and the trade’s people have started. The plumber is working now. The HVAC guys are finished. The electrician comes at the end of the week. While they are inside stuff is happening on the outside. The windows are in. The roof is on. The garage and porch have been poured. The exterior trim and siding has started. I’m just happy that the mustard colored house wrap is finally getting covered.
Pouring the front porch and garage.
Felepe starting the siding.
Front windows trimmed
The front fireplace. You are looking out of the dining room.
No comments:
Post a Comment